fbpx

Complex Ceiling Hoist Installation

Location: Mirangi Bay

Another brilliant ceiling hoist installation and happy hoist user!

Our ceiling hoist team have recently successfully installed a complex ceiling hoist system which was retrofitted into the Mirangi Bay clients existing home.

The Guldmann GH3 hoist motor with HandiMove Body Support is able to reach all rooms from the bedroom to bathroom and this has been achieved by a series of combi lock gate systems and room covering rails.

There is also a separate ceiling hoist system in the lounge and family area.

Check out the way we have managed to go through the existing cavity slider door by having a gap in the rail systems!

The 5 metre room spanning rails in the lounge have been power coated black to blend into the design.

Hoist and rails from Guldmann offer a world of different and flexible set ups so users can transfer to almost any point in the room.

The variety of tracking and hoist units means that there’s a unique system that can be specified for every environment for easy long term hoisting.

Products Featured: